Concrete Column Calculator

Concrete Column Calculator

Calculate the concrete needed for round columns, square or rectangular columns, piers and sonotube (cardboard tube) forms. Enter the size, height and number of columns to get the volume, premix bags and site-mix materials.

Round & rectangularSonotube friendlyMetric & imperialLast updated: November 2, 2026

Calculate column concrete

cm
Round: inside diameter of the form
cm
Ignored for round columns
m
pcs
%

Column volume formulas

Round column or sonotube

V = π × (d ÷ 2)² × h × N

d = inside diameter, h = height, N = number of columns. π ≈ 3.1416. Use the inside diameter of the form, since the tube wall does not hold concrete.

Square or rectangular column

V = w × d × h × N

w = width, d = depth. For a square column w and d are equal.

Order volume and bags

Vorder = V × (1 + waste%)  ·  Bags = ⌈Vorder × 2,135 ÷ bag kg⌉

Columns are formed and poured cleanly, so a 5% waste allowance is usually enough. Cement for a site mix uses the 1.54 dry-volume factor and 1,440 kg/m³ cement density.

Worked examples

Four round columns, 30 cm diameter, 3 m tall
  1. Area = π × 0.15² = 0.0707 m²
  2. Volume = 0.0707 × 3 × 4 = 0.848 m³
  3. +5% waste = 0.89 m³
  4. Premix: 0.891 × 2,135 ÷ 25 = 77 × 25 kg bags; or site mix 1:1.5:3 = 8 × 50 kg cement bags
One 12 in sonotube, 4 ft deep (deck post)
  1. Area = π × 0.5² = 0.785 ft²
  2. Volume = 0.785 × 4 = 3.14 ft³ (0.12 yd³)
  3. 80 lb bags at 0.60 ft³ each = 3.14 ÷ 0.6 = 5.2 → 6 bags

Concrete per foot of tube

Handy for sonotubes and round piers. Multiply by the depth in feet, then divide by the bag yield (0.60 ft³ for 80 lb, 0.45 ft³ for 60 lb).

Tube diameterVolume per foot80 lb bags per footVolume per metre
6 in (150 mm)0.196 ft³0.330.018 m³
8 in (200 mm)0.349 ft³0.580.031 m³
10 in (250 mm)0.545 ft³0.910.049 m³
12 in (300 mm)0.785 ft³1.310.071 m³
16 in (400 mm)1.396 ft³2.330.126 m³
18 in (450 mm)1.767 ft³2.950.159 m³
24 in (600 mm)3.142 ft³5.240.283 m³

How to use the calculator

  1. Choose the shape and units. Round for tubes and circular columns, rectangular for boxed formwork.
  2. Enter the size. Diameter for round columns; width and depth for rectangular ones.
  3. Enter the height. Measure from the bottom of the pour to the top of the column, including any part below ground.
  4. Set the number of identical columns and a waste allowance, then calculate.

If the column sits on a spread footing, work out the footing separately with the Concrete Footing Calculator and add the two volumes.

Tips for pouring columns

  • Use a strong mix. Structural columns are usually M20–M25 (3,000–3,600 psi) or higher, as specified by the engineer.
  • Pour in lifts and vibrate. Fill tall forms in layers and consolidate each one to avoid honeycombing.
  • Limit free fall. Concrete dropped more than about 1.5 m (5 ft) can separate; use a tremie or chute for tall columns.
  • Brace the form. Wet concrete is heavy; sonotubes and boxed forms must be braced plumb before you pour.

Frequently asked questions

How do I calculate concrete for a round column?

Use π × radius² × height. A column 0.3 m in diameter and 3 m tall holds 3.1416 × 0.15² × 3 = 0.212 m³.

How many bags of concrete for a 12 inch sonotube?

A 12 in tube holds 0.785 ft³ per foot of depth. At 4 ft that is 3.14 ft³, or 6 × 80 lb bags (0.6 ft³ each), or 7 × 60 lb bags.

What mix should I use for concrete columns?

For load-bearing columns, a mix of at least M20 (1 : 1.5 : 3), roughly 3,000 psi, is common. Follow the strength your engineer specifies.

Should I include the footing in the column volume?

No. Calculate the footing or pad separately, then add both volumes together for your order.

Results are estimates for planning. Column sizes, reinforcement and concrete grade for structural work must follow your engineer’s design.